top of page
On-Site Support / Gas turbine tuning

Summary
Lenja actively supported the hot recommissioning phase on the plant from first fire to base load.
This included the points of start-up optimization, synchronization of the gas turbine with the power grid, dynamic loading and unloading of the gas turbines, as well as reaching the maximum load (base load).
In all parts of the program, Lenja was responsible for ensuring the optimal, safe and sustainable operation of the gas turbine.
Location
2022
Client
Siemens SGT5-4000F(9)
Type
Middle East
Completion Year
Sulzer Turbo Services Venlo BV

bottom of page